Home Products News Contact Us
Home > Supports > Diesel Engine > Operation of Yuchai diesel engine (step 2 )

Operation of Yuchai diesel engine (step 2 )

Oct. 18, 2019

Step 2

Preparations before starting the diesel engine


To make sure that the engine would run properly, the following steps should be done before starting the engine every time:


Check the oil level in the oil sump. The level should be within the upper and ower scale limits of the oil gauge. If the oil volume is not enough, add some oil as required.


Check the diesel fuel level in the fuel tank. add some fuel if necessary.


Check the coolant level, add some coolant if necessary.


Check if there is air in the fuel pipe. De-aerate fuel if there is air in the fuel pipe.


Check if electrical system works properly.


Check the ension of the driving belt. the rension should be moderate as required.


Perform all the technical maintenance as required.



                         QQ截图20170719092527.jpg


Contact Us

  • Add.: No. 10 Kechuang Road, High tech Zone, Nanning, Guangxi, China
  • Tel.: +86 771 5805 269
  • Fax: +86 771 5805 259
  • Cellphone: +86 134 8102 4441
                    +86 138 7819 8542
  • E-mail: sales@dieselgeneratortech.com
Follow Us

Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap

Update cookies preferences
Contact Us