The degree of soiling of the combustion air cleaner depends on the amount of dust contained in the air and the size of the filter used.
The first oil change (Deutz Diesel Engine) after commissioning or recommissioning following repair work is carried out after 50 running hours.
Select the oil viscosity (SAE grade) according to the ambient temperature prevailing at the time when the engine is started.
Diesel Engine BF12M1015CP is innovated on the basis of Deutz AG Germany BFM1015 Engine.
Navigation
Contact Us
Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap