Home Products News Contact Us
Home > Supports > Diesel Generators > Daily Inspection of Volvo Generators

Daily Inspection of Volvo Generators

May. 20, 2022

Today, we will briefly introduce the contents of the daily inspection of Volvo generators.


Check before starting: Check whether the oil level of the oil dipstick is between L and H to see if there is any abnormality in the quality of the oil. Check whether there is enough cooling water in the water tank, whether the water valve is opened, and whether there is any abnormality in the cooling water. Check the tension of water pump belt, fan belt, charger belt. Check whether there is any debris between the fan and the cooling fins of the water tank, and remove if necessary. Check whether there is any debris piled on the Volvo generator, if necessary, remove it. Check the Volvo generator for oil leakage and water leakage. Check whether the battery connector is loose or oxidized. Take a look at the Volvo generator operating parameter record card, and compare whether various filters and oil have been used over time.


Volvo diesel generator


Check after starting up: Pay attention to whether there is any abnormal sound of the Volvo generator, and stop it immediately if there is any abnormal sound. Check the oil pressure gauge. Under normal circumstances, the oil pressure should not be lower than 35PSI. Check whether the frequency and voltage of the engine are stable and the working condition of the charger. The above three conditions are all normal. After 10 minutes of no-load heat engine, it will run with load. Avoid long-term operation under the conditions of more than 80% rated load. Under load conditions, listen to the diesel engine for abnormal noise, and check the oil pressure, water temperature (below 90 degrees Celsius), frequency, voltage, and smoke color. Check the Volvo generator for oil leakage, water leakage, air leakage and abnormal vibration of the Volvo generator. Check whether the temperature of the bulb shell is abnormal.


Inspection after shutdown: After unloading, run the diesel engine with no load for 10 minutes and then stop it, so that the electric ball and the lubricating parts of the diesel engine can be fully cooled. After shutdown, check whether the Volvo generator has oil leakage or water leakage. If it is necessary to check, the cooling water must be cooled 2 hours after shutdown before the cooling water can be discharged. The puddle should have a certain effective volume and height, which is convenient for the submersible sewage pump. Timely and reliable discharge of oil and water, while reducing the amount of combustibles in the room and reducing the risk of fire. The submersible sewage pump should be used for one and the other should be prepared, and should be operated under automatic control. When conditions permit, the oil and sump should be set outdoors. It is recommended that the effective volume of the oil collection and sump should be 5 to 15 minutes for the suction of the submersible sewage pump.


As a professional diesel generator manufacturer, we always insist on using first-class talents to build a first-class enterprise, create first-class products, create first-class services, and strive to build a first-class domestic enterprise. If you would like to get more information welcome to contact us via sales@dieselgeneratortech.com.

Contact Us

  • Add.: No. 10 Kechuang Road, High tech Zone, Nanning, Guangxi, China
  • Tel.: +86 771 5805 269
  • Fax: +86 771 5805 259
  • Cellphone: +86 134 8102 4441
                    +86 138 7819 8542
  • E-mail: sales@dieselgeneratortech.com
Follow Us

Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap

Update cookies preferences
Contact Us