What is the Acceptance form for final completion of works? Completion acceptance refers to a complete acceptance of all projects after the completion of the project. After the completion of the fire protection project in real estate, it is necessary to carry out fire control inspection and acceptance, so what are the contents of the acceptance?
As there is no special instrument for loading test machine, it is impossible to detect the output rated power and carrying capacity of the diesel generator set after the completion of installation project can meet the design requirements, which directly affects the acceptance of the project. According to the original design, the quality of the noise-reducing project meets the contract requirements and ensures the reasonable power loss of the generator set.
As a kind of emergency backup power supply machine, the structure of diesel generator set is very complicated. Users should pay attention to some problems in every stage of purchasing diesel generator set to safety acceptance, especially during the installation process. Below is a complete installation instruction of diesel generator set installation provided by Jiangsu Starlight Electricity Equipment Co.,Ltd.
Basic oil and Additive Basic oil can be of mineral or synthetic type. Additive gives the performance. Example of additives
Navigation
Contact Us
Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap