As an emergency backup power source, diesel generator sets can be used on any site. Usually, after one project is used up, it may need to be relocated to another project site for use, which involves the issue of unit relocation. In order to ensure the smooth use of diesel generator sets after relocation to the new site, today Dingbo Power will analyze the precautions that need to be taken during the relocation process of diesel generator sets for you.
1. Before relocating the diesel generator set, users should first have a comprehensive understanding of the condition of the diesel generator set being moved. If necessary, they can communicate with the diesel generator set provider, check the brand, weight, size, parameters and other unit information of the unit, and make records.
2. Before operating the manual unit, it is necessary to dismantle the power supply cables and have technical personnel with relevant power supply knowledge or familiar users of the unit participate to ensure the smooth progress of the relocation work and avoid damage to the unit during the relocation.
3. Do not engage in rough construction during relocation, use a crane to unload and load goods. Technical personnel should participate in disassembly and assembly to avoid damage to the equipment components of the unit, which may cause unit failure or inability to start work. All disassembled components of the unit must be properly stored and not overlooked or damaged.
4. After relocating to a new location, store in a dry warehouse. If placed outdoors, measures should be taken to prevent moisture, rain, dust, and sun exposure. Strictly regulate the installation of generator sets, the layout of the diesel engine room should meet the requirements of the process flow, pay attention to sound insulation, vibration isolation, heat dissipation and ventilation, and set up equipment to ensure lighting and fire protection, creating good conditions for use. After reinstalling the unit, a debugging of the diesel generator set is required. The unit can only be put back into use after passing the debugging to ensure the safe operation of the unit.
Compared to other mechanical equipment, diesel generator sets are relatively large and difficult to move. When users need to move the unit for use, they need to pay more attention to relevant precautions to ensure that the unit can be put into normal use after being relocated to the new site.
Dingbo Power has advanced testing equipment, modern production technology, professional manufacturing technology, perfect quality management system, and strong technical research and development capabilities. It can provide 3kW~2500kW various specifications of ordinary, automatic, four protection, automatic switching, low noise and mobile generator sets, high quality and low energy consumption to meet the diverse power needs of customers, and can also meet users with different voltages and different frequencies. It is required to create a parallel power supply system for multiple units. If you are interested in our product or any question on generator, welcome to send email to sales@dieselgeneratortech.com.
Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap
Update cookies preferences