Preparation Work Before Installation Of Diesel Generator Set

Jul. 26, 2021

With the continuous development of social economy, the demand for electricity in various fields of our society is increasing. However, due to various factors, the power system sometimes cannot provide enough power for the development of the enterprise. As an independent power supply device, the diesel generator can quickly start the AC power that meets the load demand, so as to ensure the smooth progress of the daily production and operation of the enterprise. So do you know what preparations need to be made before installing diesel generators? In this article, the editor of Starlight will introduce you from diesel generator assembly, unloading, unpacking, marking and positioning, inspection equipment, lifting equipment, installation tools, etc.

 

1. Diesel generator assembly, unloading and transportation.

 

Please pay attention to tighten the lifting rope when loading and unloading, and lift it gently. After the goods are delivered to the destination, they should be placed in the warehouse as much as possible. If there is no open-air storage, the fuel tank should be raised to prevent rainwater from getting wet. The box should be covered with a rain-proof tent to prevent the equipment from being damaged by the sun and rain .

 

Due to the large volume and heavy weight of diesel generators, transportation routes should be arranged before installation, and transportation ports should be reserved in the engine room. If the doors and windows are not large enough, you can use the door and window positions to reserve a larger port, and after the standby group is moved in, the walls and doors and windows are installed.

 

diesel generator set


2.Unpack the diesel generator.

Clean the dust before opening the box and check whether the box is damaged. Check the box number and quantity, and do not damage the machine when unpacking. The unpacking sequence is: top fold, and then fold the side panels. The following work should be done after the cabinet is disassembled:

 

(1)Check all units and accessories according to the unit list and packing list.

(2) Check whether the main dimensions of the equipment and its accessories are consistent with the drawings.

(3) Check whether the equipment and accessories are damaged or corroded;

(4) If the disassembled parts cannot be installed in time after inspection, the surface of the disassembled parts should be re-coated with anti-rust oil for proper protection. Before the anti-rust oil is removed, the transmission and sliding parts of the unit are not rotated. If the anti-rust oil has been removed after the inspection, apply another layer of anti-rust oil after the inspection.

(5) After unpacking, the unit must be kept horizontally. The flanges and various interfaces must be covered and bandaged to prevent rainwater and sand from entering.

 

3. Diesel generator positioning and marking.

Determine the vertical and horizontal reference lines of the installation position of the unit according to the dimensions of the relationship between the unit and the center of the wall or column. Determine the vertical and horizontal reference lines of the installation position of the unit according to the size of the relationship between the unit and the center of the wall or column and the unit indicated in the layout plan of the diesel generator unit. The allowable deviation between each unit is 10mm.

 

4. Diesel generator inspection equipment is ready for installation.

Inspect the equipment, understand the design content and construction drawings, prepare materials according to the design drawings, and send the materials to the construction site in order according to the construction plan.

 

If there is no design drawing, please refer to the manual, and according to the equipment use and installation requirements, while considering the water source, power supply, maintenance, use and other conditions, determine the size and location of the civil construction plane, and draw the layout plan.

 

5. Diesel generators are ready for lifting equipment and installation tools.

It is worth noting that if the diesel generator set cannot be installed in time after inspection, the finished surface of the disassembled parts should be re-coated with anti-rust oil and stored properly. For the transmission and sliding parts of the unit, do not rotate or slide before the anti-rust oil has been removed. If the anti-rust oil cannot be inspected, apply another layer of anti-rust oil after the inspection.

 

Jiangsu Starlight Electricity Equipments Co.,Ltd. is one of the earliest manufacturers of generating sets in China. It has first-class testing equipment, advanced production technology, professional manufacturing technology, perfect quality management system, and strong R&D technical strength. It can provide 3KW-2500KW various specifications of universal, automatic, four protection, automatic switching, low noise and mobile, etc., high-quality, low-energy generating sets to meet all customers' power needs, and can also meet users' different voltages and different Frequency requirements, as well as the parallel-connected power supply system of multiple units, use excellent talents to build excellent enterprises, create excellent products, create excellent services, and strive to build excellent domestic enterprises. For more product details, please contact us with sales@dieselgeneratortech.com


Contact Us

  • Add.: No. 10 Kechuang Road, High tech Zone, Nanning, Guangxi, China
  • Tel.: +86 771 5805 269
  • Fax: +86 771 5805 259
  • Cellphone: +86 134 8102 4441
                    +86 138 7819 8542
  • E-mail: sales@dieselgeneratortech.com
Follow Us

Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap

Update cookies preferences
Contact Us