Guangxi Dingbo Power, a Volvo generator set manufacturer, is committed to diesel generator sets, silent generators, mobile trailer generators, etc. The company has professional technical engineers who often go to various construction sites to install and debug diesel generator sets. They have rich practical experience in the no-load commissioning of diesel generator sets. Today, the Volvo diesel generator set manufacturer would like to share with you the specific no-load commissioning plan for the commissioning work.
1. During no-load commissioning, the technical staff of the diesel generator would like to remind you: Be sure to confirm that the power output switch of the unit is in the off position. Only in the off position can it be ensured that the unit runs under no-load conditions.
2. Manually start the unit. The first no-load running time should be greater than 30 minutes.
3. During no-load operation, carefully observe the overall situation of the unit. Check for any oil leaks, water leaks, whether the sound and vibration are normal, and whether the exhaust smoke color is light gray.
In actual operation, although the no-load commissioning work of diesel generator sets is not very complicated, there are still points to note. It is best not to operate if you are not a professional. If you are not careful, it is easy to cause the failure of the diesel engine to start properly. Therefore, pay attention to details during no-load commissioning to avoid failures.
4. Observe whether each parameter data is within the normal range: The oil pressure should be above 0.3MPa and basically constant; the coolant water temperature should rise to about 80°C in about 15 minutes and basically remain constant; check whether the frequency is normal. For mechanical speed regulation, it should be 51.5Hz, and for electronic speed regulation, it should be 50Hz; check whether the voltage indication is about 400V and stable, with no output current.
5. Simulate three protection states of low oil pressure, high water temperature, and overspeed to test the protection and shutdown functions of the unit.
6. Through simulation, check the control functions of the unit, such as whether the automatic start/stop function and the ATS automatic switching function can be put into operation normally.
Founded in 1974, Dingbo Power Generation Equipment Co., Ltd. is a professional manufacturer of diesel engines, generators and generator sets, and one of the earliest manufacturers of diesel engines, generators and generator sets in China. Since 1992, the company has been a qualified generator set manufacturer inspected by the National Internal Combustion Engine Generator Set Quality Supervision and Inspection Center. Over the years, the company has carried out extensive cooperation with Shanghai Diesel, Weichai, Sweden Volvo, Sino US joint venture Chongqing Cummins, American Qianglu and other companies, and has become a (OEM) supporting factory and technical center. It has 64 sales service departments nationwide, providing users with design, supply, commissioning and maintenance services at any time. Dingbo quality is worth depending on. If you want get more information, please feel free to send email to [email protected] we will pay highly attention on your question.
Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap
Update cookies preferences