Home Products News Contact Us
Home > News > Preparation Work Before Installation The Volvo Generator Set

Preparation Work Before Installation The Volvo Generator Set

Aug. 04, 2023

Today we will give you a brief introduction about the preparatory work for the installation of Volvo generator sets. If anyelse you need to know, welcome to visit our Dingbo website. And then we will introduce the related content to you.


80kw 100kva Cummins Diesel Generator Set


When handling Volvo generator sets, pay attention to tie the hoisting ropes in appropriate positions, and lift them gently. When the Volvo generator set is transported to the destination, it should be placed in the warehouse as much as possible. If there is no warehouse and need to be stored in the open air, the fuel tank should be raised to prevent rainwater from getting wet. A rainproof tent should be placed on the box to prevent the sun. Rain damages the equipment. Due to the large volume and heavy weight of Volvo generator sets, transportation routes should be arranged before installation, and transportation ports should be reserved in the machine room. If the doors and windows are not big enough, you can use the door and window positions to reserve a larger port. After the Volvo generator set is moved in, you can repair the walls and install the doors and windows.


Before unpacking, clean the dust and check whether the box is damaged. Check the box number and quantity, and do not damage the machine when opening the box. The unpacking sequence is to fold the top panel first, and then remove the side panel. After unpacking, you should do the following: check all Volvo generator sets and accessories according to the Volvo generator set list and packing list; check whether the main dimensions of the Volvo generator sets and accessories are consistent with the drawings; check whether the Volvo generator sets and accessories are damaged or corroded ; If the Volvo generator set cannot be installed in time after inspection, the finished surface of the disassembled parts should be re-coated with anti-rust oil for proper protection. For the transmission and sliding parts of the Volvo generator set, do not rotate until the anti-rust oil has been removed. If the anti-rust oil has been removed after the inspection, the anti-rust oil should be re-coated after the inspection. After unpacking, the Volvo generator set must be kept horizontally. The flanges and various interfaces must be covered and bandaged to prevent rainwater and dust from entering.


The marking and positioning shall be based on the size of the relationship between the Volvo generator set and the center of the wall or column, and between the Volvo generator set and the Volvo generator set as marked in the Volvo generator set layout plan, and delineate the vertical and horizontal reference lines for the installation site of the Volvo generator set. . The allowable deviation between the center of the Volvo generator set and the center of the wall or column is 20mm, and the allowable deviation between the Volvo generator set and the Volvo generator set is 10mm.


Inspection equipment Prepare to install inspection equipment, understand the design content and construction drawings, prepare materials according to the materials required by the design drawings, and deliver the materials to the construction site in order according to the construction plan. If there is no design drawing, please refer to the manual, and according to the use and installation requirements of the equipment, while considering the water source, power supply, maintenance and use, etc., determine the size and location of the civil construction plan, and draw the layout plan of the Volvo generator set. Prepare lifting equipment and installation tools.


Dingbo Power was founded in 2006 and is one of the earliest manufacturers of generators and diesel generator sets in China. If you want get more information, please feel free to send email to sales@dieselgeneratortech.com we will pay highly attention on your question.

Share
Contact Us
  • Add.: No. 10 Kechuang Road, High tech Zone, Nanning, Guangxi, China
  • Tel.: +86 771 5805 269
  • Fax: +86 771 5805 259
  • Cellphone: +86 134 8102 4441
                    +86 138 7819 8542
  • E-mail: sales@dieselgeneratortech.com
Follow Us

Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap

Update cookies preferences
Contact Us