Normal Starting Procedure & light load operation of Perkins standby generating sets
Removal 1 Check, and where necessary adjust, valve clearances according to Valves, Adjustment page 49. 2 Remove the injectors; refer to Injector, Change page 123. 3 Remove the electrical connection to the control valve.
A lot of illustration contains standardized symbols and colors. Please refer to the following information to reduce misunderstanding when working on an engine / transmission using this workshop manual.
If you don't know how to operate Perkins generator 4006/4008 Series engines, this article will show you detailed information about Perkins lubrication system, cooling system and fuel system.
Navigation
Contact Us
Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap